The project includes the reconstruction of the garage, a renovation to all bathrooms and master suite, along with the additions of a small sitting room, patio expansion, and outdoor shower. From schematic design to the beginning of demolition, I was responsible for the overall project development, drawing set documentation, and model management. I assisted the team by reviewing the building code and permit submission requirements, generating internal design meeting and client presentation materials, leading correspondance and coordination with the structural engineer and window wall manufacturers, and generating drawing details.